PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing rebar Footings at Elev. 7-Stair -4,5 Facing East (800x600).jpg Backfill foundation walls A-B line 4 Facing West (800x600).jpg Backfill Job site Facing South (800x600).jpg Finish rebar installation at footings Elev. 7-Stair -4,5 Facing North (800x600).jpg Securing the Shear wall panels at Elev. 1,2,3 2nd floor Facing East (800x600).jpg Waterproofing around foundation walls at Elev. 4-Stair -2 Facing North-East (800x600).jpg Compacting soil around foundation walls at Elev. 5-6 Facing (800x600).jpg Installing the Shear wall panels at Elev. 1,2,3 2nd floor Facing South-East (800x600).jpg
Previous pageNext page Securing the Shear wall panels at Elev. 1,2,3 2nd floor Facing East (800x600)
Securing the Shear wall panels at Elev. 1,2,3 2nd floor Facing East (800x600)